Soakaway Blockage
- JDS Drainage
- Mar 2, 2018
- 1 min read
Updated: Dec 21, 2023
My customer was having problems with blockages in the pipework between a treatment plant and a soakaway, so wanted the pipework altered and access in case of any future problems.
We constructed a chamber using concrete sections, created a half-moon channel with pipework and cement, then installed a new cover and frame on top of the concrete sections. These were then backfilled to level, finished off with top soil.

Commentaires