New Water Main Installation
- JDS Drainage
- Nov 13, 2018
- 1 min read

This job was to supply and install a new mdpe 28mm water main.
We excavated a trench from the property boundary up to a point of entry up the side of the house.
The trench was dug by a machine to a depth of 900mm into which we laid the new water main and surrounded in soft sand.
We cored through the wall at the new point of entry and fed through making sure the area of pipe coming through the wall was sleeved.

Once all in and surrounded in sand, made good the hole that water main had been fed through and backfilled the trench up to a suitable level compacting as we went.
Reinstated with black dye concrete to finish.